Plant 129 Well Design & Construction

Two reservoirs in a residential neighborhood

The Drought Contingency Plan (DCP) includes a list of mitigation actions needed to protect against potential risks and impacts from drought and to increase flexibility and resiliency. The Priority 1 mitigation actions in the DCP include six projects to drill and equip new groundwater wells.

A Site Feasibility for New Groundwater Production Well Technical Memorandum, which is included as part of the DCP, provided a high-level assessment of Plant 129 and determined that the site is suitable for a new production well. This project will design, drill, and equip a new groundwater production well at Plant 129.

Total Project Cost

$3,000,000


Project type

Water


Current Phase

Design


Projected Completion

June 2027


Location

7800 Calle Del Rio
Highland, CA 92346