There are 18 existing storage reservoirs in EVWD’s water system ranging from 0.07 million gallons (MG) to 4 MG in capacity. Per the District’s 2019 Water System Mater Plan, it was recommended that seismic retrofitting be performed on all EVWD tanks. This proposal will cover Phase I of two for a FEMA Hazard Mitigation Grant Program (HMGP) awarded to the District. Phase I portion of the work will consist of engineering analysis, planning, and bid package preparation for the construction of the Phase II portion.
$660,000 (Grant Funded)
Water
Planning and Design
June 2025