Reservoir Seismic Retrofits - 7 Reservoirs, Phase I

Reservoir with a neighborhood in the background

There are 18 existing storage reservoirs in EVWD’s water system ranging from 0.07 million gallons (MG) to 4 MG in capacity. Per the District’s 2019 Water System Mater Plan, it was recommended that seismic retrofitting be performed on all EVWD tanks. This proposal will cover Phase I of two for a FEMA Hazard Mitigation Grant Program (HMGP) awarded to the District. Phase I portion of the work will consist of engineering analysis, planning, and bid package preparation for the construction of the Phase II portion. 

Total Project Cost

$660,000 (Grant Funded)


Project type

Water


Current Phase

Planning and Design


Projected Completion

June 2025