Water Standard Drawings

Drawing No. Plan Revision Date
W-101A
Water Service Installation 3/4" Thru 2" (D.I.P.) April 2022
W-101B
Water Service Installation 3/4" Thru 2" (A.C. Pipe) April 2022
W-101C
Water Service Installation 3/4" Thru 2" (D. & W. Pipe) April 2022
W-101D
Water Service Installation 3/4" Thru 2" (C.M.L & C.) April 2022
W-102
Water Service Installation 3" And Larger April 2022
W-103A
4" Blow-Off Assembly For Mains 6" April 2022
W-103B
6" Blow-Off For Mains 12"-16" (Wet Barrel FH) April 2022
W-103C
6" Blow-Off For Mains 20"-36" Mains (Wet Barrel FH) April 2022
W-104
Typical Main Connection Details April 2022
W-105A
1" Combination Air & Vacuum Valve Assembly April 2022
W-105B
2" Combination Air & Vacuum Valve Assembly April 2022
W-105C
4" Combination Air & Vacuum Assembly April 2022
W-107
Vertical Protection Zones For Sewer And Water April 2022
W-107
Vertical Protection Zones For Sewer And Water April 2022
W-108
Thrust Block Details April 2022
W-109
Double Detector Check Assembly (In-Line) April 2022
W-110
Low Profile D.D.C. Assembly (N-Shape) April 2022
W-111
Guard Posts Or Bollards April 2022
W-112
Fire Hydrant Installation April 2022
W-113
Class 150 - Bolt And Flange Table April 2022
W-114
Typical Installation Of Reduced Pressure Principle Backflow Prevention Assembly April 2022
W-115
Typical Waterline & Water Meter Layout April 2022
W-116
Standard Symbols & Linetypes April 2022
W-117
Service Manifold April 2022
W-118
Valve Stem Extension April 2022
W-119
Valve Box April 2022
W-120
Steel Casing For Water Pipe April 2022
W-121
Water Trench April 2022
W-122
Water Sample Station April 2022